Public Private Partnership Office
 

Project Profile

Supply, Installation And Commissioning of A Multi-Mode Surveillance System (Radar, Ads-B Wide Area Multilateration-Wam) Along With ATC And Communication System At Hazrat Shahjalal International Airport (HSIA), Dhaka
Project Information
Details
Project Name:
Supply, Installation And Commissioning of A Multi-Mode Surveillance System (Radar, Ads-B Wide Area Multilateration-Wam) Along With ATC And Communication System At Hazrat Shahjalal International Airport (HSIA), Dhaka
Sector:
Transport (Aviation)
Department/Ministry:
Ministry of Civil Aviation & Tourism
Implementing Agency:
Civil Aviation Authority of Bangladesh (CAAB)
Location:
Hazrat Shahjalal International Airport (HSIA), Dhaka
Estimated Capital Cost:
< $6m
$6-30m
$30-80m
$80-200m
$200-500m
> $500m
Approval:
Cabinet Committee for Economic Affairs approved the project on 23 September 2013.
Background:
The ATC (Air Traffic Control) Radar at HSIA, Dhaka is coming toward the end of its project life. Therefore, to ensure planned requirement of the existing radar facility, CAAB has put in place proposal for Supply, Installation And Commissioning of a Multi-Mode Surveillance System Along With ATC And Communication System At Hazrat Shahjalal International Airport (HSIA), Dhaka On Public Private Partnership Basis.

The project is to provide CAAB with a ICAO/FAA/EUROCONTROL brand new and latest set of Radar (both Primary and Secondary solid state co-mounted), ADS-B and WAM for whole of Dhaka FIR (Flight Information Region) along with state of the art ATC and communications system with a brand new Integrated ATC Center and Control Tower (minimum 50 meter height) under PPP. It also includes 10 years technical maintenance of the full system with spare parts, training of 60 controllers, 40 engineers over 10 years and technical upgrade in year 8.
Objective:

The Project shall be designed in compliance with the international standards with the key objectives of:

•  Supplying best quality and latest version of equipment/systems in the field of Surveillance, Communication and ATC.

•  Providing a boost to the initiative towards compliance of ICAO standards for CAAB.

•  Introducing enhanced levels of Surveillance and Air Traffic Control and management efficiency by use of new technical know-how and methodologies.

•  Construct an iconic Air Traffic Control Tower along with well-planned and equipped Air Traffic Control Center.

Project Scope:

•  Supply, Installation & Commissioning of Multi-Mode Surveillance System

•  Develop and Upgrade Communication System

•  Upgrade ATC System including New ATC Centres in Compliance with IACO Guidelines

Project Implementation Period:
Development Period: 2013 - 2014
Procurement Period: 2014 - 2015
Status:

Project Screening
 

Project
Preparation Stage
 

Procurement Stage
RFQ | RFP
Note:
  1. ICAO has been appointed as Technical and Commercial Consultant
  2. Registration of Interest has been issued on 24 March 2014
  3. An unsolicited proposal is under consideration for this project
  4. RFQ and RFP has been issued on 08 November 2015
Contact:

Md. Abul Bashar
Director (Investment Promotion)
Phone: +88 02 9898545
E-mail: bashar@pppo.gov.bd
PPPO Logo
Public Private Partnership Authority
Prime Minister's Office
Green Delta AIMS Tower (Level-13)
51-52, Mohakhali, Dhaka-1212,
Bangladesh
Phone: +88 02 9898455
Fax: +88 02 9898511
(Last updated 31 August 2016; subject to further revision.)
Top